14

PRE-TREATMENT EQUIPMENT ROOM GUIDELINES A properly designed equipment room will consider and/or incorporate the following: Allow room for water treatment equipment plus site and owner equipment (pressure washers, compressors, etc.) Electrical and control panels require 30" clearance 18-20" maintenance access clearance around equipment recommended See Equipment Detail Drawings for equipment specifications (size, utility requirements, electrical/control panel locations, etc.) Floor should slope towards floor drains to contain any spillage A Stub Up should be available for overflow to return to pit or trench and discharge to waste or sewer Door should be sized to allow equipment move-in Ventilation: Required top and bottom (based on specific equipment requirements) SLOPE TO GUIDE SPILLAGE TOWARD FLOOR DRAIN(S) DOOR SLOPE FLOOR DRAIN(S) STUB UP FOR DISCHARGE TO WASTE OR SEWER STUB UP FOR RETURN TO PIT OR TRENCH ROLL-UP DOOR MUST BE WIDER AND TALLER THAN EQUIPMENT FOR MOVE-IN SLOPE SLOPE 14