178

ADMINISTRATION AND PROCEDURES vii. Maintenance of the site, structures, and landscaping; viii. Means of controlling glare, vibration, odors, dust, smoke, hazardous materials, refuse matter, water-carried waste, and storm water; and ix. A time limit for operation of the use, if temporary operation is determined to be a typical characteristic of the proposed use or otherwise appropriate given unique circumstances of the proposed use. G. Subsequent to approval by the Planning and Zoning Administrator or the BZBA, and compliance with all applicable conditions of such approval and of this Zoning Code, the Planning and Zoning Administrator shall issue a zoning certificate stating the conditional use and all conditions of its approval. H. Approval of a conditional use shall be void upon the occurrence of any or all of the following: i. The applicant fails to commence construction of the structure in which the approved conditional use is to be conducted within one (1) year of the date of approval; ii. The applicant fails to commence the operation of the conditional use within six (6) months of the date of the approval, where such use is to be conducted in an existing structure; and/or iii. The conditional use is operated in a manner which violates any condition of the approval. I. The Planning and Zoning Administrator shall review all approved conditional use permit applications six (6) months after final action to determine if the approved use is in operation and otherwise in compliance with all conditions of approval. Upon such six (6) month review the Planning Zoning Administrator shall proceed in accordance with the circumstances outlined below: i. If the Planning and Zoning Administrator finds the conditional use to be in operation and in compliance with the conditions of approval, the Planning and Zoning Administrator shall notify the BZBA of such compliance. ii. If the Planning and Zoning Administrator finds that construction has not begun, the Planning and Zoning Administrator shall record that information for an additional six (6) month review, and shall notify the BZBA of such inaction. iii. If the Planning and Zoning Administrator finds a use in an existing structure or building not to be in operation, the permit and zoning certificate shall be deemed revoked and the Planning and Zoning Administrator shall notify the applicant of such revocation as well as the BZBA. Upon such revocation, the applicant shall have the right to appeal that decision of the Planning and Zoning Administrator to the BZBA and request the BZBA allow up to one (1) additional six (6) month period to begin operation following the administrative appeal procedure. J. Whenever the Planning and Zoning Administrator determines that a conditional use is being operated in a manner that violates any condition of the use’s approved permit, the permit and zoning certificate shall be considered revoked. The Planning and Zoning Administrator shall notify the permit holder as such, who shall immediately discontinue operation of the use: i. If this determination is made in conjunction with the six (6) month review procedure for an approved permit, the Planning and Zoning Administrator shall also notify the BZBA. The applicant shall have the right to appeal this determination of the Planning and Zoning 194

179 Publizr Home


You need flash player to view this online publication