Page 2 THE REVERE ADVOCATE – FRIDAY, NOVEMBER 13, 2026 APPROVED | FROM Page 1 fi led by the City of Revere for the Wonderland Sewer Improvements, also known as Conveyance Project No. 1. Project Manager Kara Rozycki and Wetlands Scientist Magdalena Lofstedt, representing the engineering fi rm CDM Smith, Inc., presented the proposal. Rozycki explained that the project calls for the installation of approximately 3,300 feet of new gravity sewer, ranging in diameter from 36 to 60 inches, extending from North Shore Road to Harris Street. The work also includes 443 feet of new 12-inch gravity sewer within North Shore Road. An existing 24-inch sewer line running from VFW Parkway to American Legion Highway will remain in service during construction. The primary purpose of the improvements is to reduce Sanitary Sewer Overflows (SSOs) in accordance with a 2010 Consent Decree between the city and state and federal authorities. Under the agreement, Revere is required to address longstanding violations of the federal Clean Water Act, with particular em“WE’RE STILL HERE!” Since 1947 MALDEN AUTO BODY Book online: Maldenauto.com 49 Robin St., Everett, MA 617-389-3030 * Maldenab@yahoo.com Over 79 years of exceptional service! Massone Family Owned & Operated phasis on eliminating SSOs. Rozycki said the project is expected to go out to bid this winter, with construction scheduled to begin in the spring of 2027 and be completed in the fall of 2028. Although the project area does not contain wetlands, it falls within the 100-year floodplain, placing it under the jurisdiction of the Conservation Commission. Commissioners Thomas Carleton and Rudolph expressed concerns about the lack of a contractor at the meeting who could answer questions about important construction details, including dewatering procedures, equipment and excavatedmaterial staging areas, and post-construction landscaping and replanting. Lofstedt explained that the city’s public bidding process requires all necessary permits to be secured before the project can be put out to bid. She also noted that Revere has secured a low-interest state loan that could be jeopardized if the bidding process does not move forward this winter. Following considerable discussion, the commission approved the NOI with the stipulation that the contractor awarded the project must return before the commission to address the members’ outstanding questions and provide additional details about the construction plans. Other Applications and Enforcement Matters The commission next considered an NOI submitted by homeowner Megan Lindstrom for the paving of the driveway at 55 Fowler Ave. The existing driveway consists of crushed stone, but Lindstrom told commissioners that she intends to use permeable asphalt for the new surface. The application received unanimous approval. The next matter involved a Notice of Violation concerning a retaining wall installed at 15 Arcadia St. in the Oak Island neighborhood. The homeowner subsequently fi led an after-the-fact NOI. Sam Barrows appeared on the homeowner’s behalf and explained that a small, nonstructural stone wall in the backyard had been deteriorating. The homeowner decided to dismantle the wall, reuse the existing stone, and install new mortar. However, the work was undertaken without first filing an NOI. Rudolph said he wanted to determine whether an NOI had been fi led for the original wall when it was constructed. The commission was unable to issue an Order of Conditions (OOC) because the state Department of Environmental Protection (DEP) had not yet assigned a File Number, which is required before a local conservation commission can issue its order. The matter was continued until next month’s meeting. The fourth agenda item was an NOI for renovations to the deck pilings at 171 Rice Ave. in the Point of Pines. Christian Wright of Modern Restoration outlined the proposed work, which includes the construction of a new stairway from an existing porch. Ward 5 City Councillor Angela Guarino Sawaya raised questions about the project’s scope and its potential impact on neighboring properties. As with the previous matter, the commission could not issue an OOC because the state DEP had not yet provided a File Number. The matter was continued until December for a vote. Commissioners then turned to a Cease and Desist Order issued to the owner of 65 Ellerton St. in Oak Island, near Diamond Creek. Rudolph explained that the homeowner had begun pouring concrete for a parking area in front of the residence without fi rst fi ling an NOI or obtaining the necessary approval from the Building Department. Contractor James Flanagan appeared with homeowner Jose Gonzalez to discuss the matter. Following discussion, the commission determined that Gonzalez must first appear before the Building Department to address the city’s zoning requirements for parking. He also must retain an environmental engineer to determine the appropriate water-storage and drainage measures needed to accommodate the proposed impermeable concrete surface. Rudolph and Averbach Re-elected In the fi nal business of the evening, commissioners selected their offi cers for the coming year. Rudolph was re-elected chair, while Averbach was reelected vice-chair for 2027.
3 Publizr Home