41

39 Briefl y describe the construction method Volumetric construction, steel frame modules, slip-form concrete for cores, rainscreen cladding, concrete podium over parking. The entire scheme has been designed to be constructed from steel volumetric pods. We believe it to be the tallest volumetric residential tower in Europe. Through volumetric construction the scheme aimed to improve build quality, reduce construction waste and speed up the construction process. The tower balconies were constructed as part of the modules and used as supports for the façade works, removing the need to scaffold the building. Why was this method chosen? The system is the contractor’s preferred construction method. How did costs compare with traditional methods? Similar costs but shorter construction period. Were there any additional/ unusual approvals needed? No. Would you use this method again? Yes, we are working on three more projects with the contractor. What are your reasons? Quality of the build, speed of construction, repeat business. Were there any diffi culties with the method chosen? Design decisions must be made on time to enable the factory to start production of the modules. Stacked structures and services are needed in the design.

42 Publizr Home


You need flash player to view this online publication